Fulcrum was appointed to deliver a comprehensive multi-utility package to power a residential development of 41 new domestic dwellings. The project presented several logistical and technical challenges, including offsite works within the public highway, network capacity constraints, phased delivery requirements and the need to future-proof the infrastructure for electric vehicle charging.
Full multi utility delivery for 41 new homes
Infrastructure designed to accommodate electric vehicle charging at every new home
The client benefited from a streamlined delivery model, reduced programme risk and a future-proofed utility infrastructure tailored to the needs of a modern residential development.
The project demonstrates Fulcrum’s ability to manage complex, multi-utility residential schemes efficiently, delivering safe, compliant and cost-effective connections from design through to completion.
We delivered a full multi-utility package for a 41-home residential development in Essex, providing gas, electricity, water, and fibre infrastructure through a single point of contact. We future-proofed the infrastructure to accommodate electric vehicle charging at every home, while maintaining a cost-effective and compliant solution. This project highlights our ability to manage complex, multi-utility residential schemes from design through to completion, delivering safe, efficient, and future-ready utilities for developments.
Discover how our team of experts can provide the best connections service for your next project.